What a busy 4 weeks it has been!! There has been contractors at the house nearly every day.....we could count on one hand the days that nobody was working.
Where to start?? Well, the kitchen went in about 3-4 weeks ago. It has turned out nice. The cupboards are gloss polyurethane - in a charcoal type colour. The 40mm caesarstone benchtops also have gone in and look real snazzy. Some pictures of the kitchen below (they have covered all the benches and cupboards in bubble wrap now for protection - so the best picture was before the benches went in).
The bathroom tiling is now completed. We eneded up getting tiling to the ceiling. We are both very happy with how they have turned out. The electrical and plumbing fitout has been done - and the first coat of paint applied. The tilers were also back yesterday (yes - on a Saturday) starting the main floor tiling.
Our Site Supervisor will let us know this week what the PCI and Handover dates are likely to be. Fingers crossed we will be in around mid-late August.....
Kitchen....Charcoal Gloss Poly
Downstairs Living Room
Downstairs Rumpus Room
Home Theatre
Hall (looking from back of house)
Hall (looking from front of house)
Powder Room Shower
Powder Room Toilet
Powder Room Vanity
Main Bedroom TV Alcove (will have caesarstone top)
Main Bedroom Feature Wall
Main Bedroom Ensuite Spa Bath (14 jets with hot pump!)
Main Bedroom Ensuire His/Her Vanity
Main Bedroom Rainforest Shower (there will be a 2nd normal shower head added also)
Upstairs Lounge Feature Wall (play room)
Bedroom 2 Ensuite Shower (all other bedroom have similar ensuites)
Laundry
Sunday, July 18, 2010