Here are some internal photos. Please ignore the mess - as we are still unpacking and putting everything away! The photo quality is poor...I think it is time for a new camera. The outside landscaping is underway - and I will post more photos of that soon.
Our nice new kitchen!
Worlds biggest pantry:
Home Theatre room....100inch screen:
Rumpus room...will have the table tennis there a.s.a.p.
Living Room:
Laundry:
Study (still unpacking):
Staircase...for some reason the tiles look green here. But they are actually more of a grey colour:
Downstairs loo:
Living room (again...tiles look more brown than grey in this photo):
Photo of dining room. You can see the start of our pool and alfresco:
Looking towards front of house from dining/living area:
Upstairs Lounge (aka Kids room)
Master bedroom balcony...soon to be home Gym (with TV and all):
Main bedroom media alcove...still to buy a TV for here:
Main bedroom:
Walk in Robe...the Wife side:
Walk in Robe...the Husband side:
Main bedroom Ensuite (With Rainforest shower head as well as the nomral one):
Main bedroom Ensuite (cant wait to use the spa!)
Main bedroom Ensuite (his and hers basins):
Bedroom 2 ensuite....all the bedrooms have similar ensuites:
Double doors to front balcony:
View from from upstairs front balcony..looking towards rear of house. All the linen cupboards and laundy chute are on the right:
That is about it for now. More outside pictures soon.....
Monday, August 30, 2010
Friday, August 27, 2010
Handover last week :)
Hi all,
Sorry for the lack of updates. We actually had handover last week (17th August) - which was pretty much right on schedule.
We moved in last weekend. Let me say...moving sucks. We have so much furniture...it took the removalists 12hrs to get everything across...and that is only going 5km and with a 10 tonne truck!
We only just got our Internet connected last night - but for some reason it is painfully slow. I am waiting on Optus/Telstra to fix the problem - and I will then update blog with photos galore.
Regards,
hills_builder
Sorry for the lack of updates. We actually had handover last week (17th August) - which was pretty much right on schedule.
We moved in last weekend. Let me say...moving sucks. We have so much furniture...it took the removalists 12hrs to get everything across...and that is only going 5km and with a 10 tonne truck!
We only just got our Internet connected last night - but for some reason it is painfully slow. I am waiting on Optus/Telstra to fix the problem - and I will then update blog with photos galore.
Regards,
hills_builder
Sunday, July 18, 2010
Kitchen, Tiling, Painting etc etc etc
What a busy 4 weeks it has been!! There has been contractors at the house nearly every day.....we could count on one hand the days that nobody was working.
Where to start?? Well, the kitchen went in about 3-4 weeks ago. It has turned out nice. The cupboards are gloss polyurethane - in a charcoal type colour. The 40mm caesarstone benchtops also have gone in and look real snazzy. Some pictures of the kitchen below (they have covered all the benches and cupboards in bubble wrap now for protection - so the best picture was before the benches went in).
The bathroom tiling is now completed. We eneded up getting tiling to the ceiling. We are both very happy with how they have turned out. The electrical and plumbing fitout has been done - and the first coat of paint applied. The tilers were also back yesterday (yes - on a Saturday) starting the main floor tiling.
Our Site Supervisor will let us know this week what the PCI and Handover dates are likely to be. Fingers crossed we will be in around mid-late August.....
Kitchen....Charcoal Gloss Poly
Downstairs Living Room
Downstairs Rumpus Room
Home Theatre
Hall (looking from back of house)
Hall (looking from front of house)
Powder Room Shower
Powder Room Toilet
Powder Room Vanity
Main Bedroom TV Alcove (will have caesarstone top)
Main Bedroom Feature Wall
Main Bedroom Ensuite Spa Bath (14 jets with hot pump!)
Main Bedroom Ensuire His/Her Vanity
Main Bedroom Rainforest Shower (there will be a 2nd normal shower head added also)
Upstairs Lounge Feature Wall (play room)
Bedroom 2 Ensuite Shower (all other bedroom have similar ensuites)
Laundry
Where to start?? Well, the kitchen went in about 3-4 weeks ago. It has turned out nice. The cupboards are gloss polyurethane - in a charcoal type colour. The 40mm caesarstone benchtops also have gone in and look real snazzy. Some pictures of the kitchen below (they have covered all the benches and cupboards in bubble wrap now for protection - so the best picture was before the benches went in).
The bathroom tiling is now completed. We eneded up getting tiling to the ceiling. We are both very happy with how they have turned out. The electrical and plumbing fitout has been done - and the first coat of paint applied. The tilers were also back yesterday (yes - on a Saturday) starting the main floor tiling.
Our Site Supervisor will let us know this week what the PCI and Handover dates are likely to be. Fingers crossed we will be in around mid-late August.....
Kitchen....Charcoal Gloss Poly
Downstairs Living Room
Downstairs Rumpus Room
Home Theatre
Hall (looking from back of house)
Hall (looking from front of house)
Powder Room Shower
Powder Room Toilet
Powder Room Vanity
Main Bedroom TV Alcove (will have caesarstone top)
Main Bedroom Feature Wall
Main Bedroom Ensuite Spa Bath (14 jets with hot pump!)
Main Bedroom Ensuire His/Her Vanity
Main Bedroom Rainforest Shower (there will be a 2nd normal shower head added also)
Upstairs Lounge Feature Wall (play room)
Bedroom 2 Ensuite Shower (all other bedroom have similar ensuites)
Laundry
Sunday, June 20, 2010
Plastered.......oh yeah!
We got plastered this week. No it was not the alcoholic type - but of the gyprocking kind :)
There was a few weeks delays finishing the lower roof due to all the rain Sydney had in the beginning of June. But the guys bolted down and got the roof completed a couple of weeks ago. We also finally had our electricity connected...which Wisdom were patiently waiting for me to organise. We wanted three phase power - but unlucky for us we have underground power - and our power was connected about 50m around the corner. I had to get a level 2 electrician to dig a trench and run extra cables. This alone cost a small fortune - but we are just happy it is now done.
Last week we had the insulation team come through. They were a lovely elderly couple (certainly not your typical tradesmen!). They installed all the bradford R2.0 wall and R3.5 ceiling batts. I also went through afterwards and installed some sound proofing batts in the ceiling between the home theatre and one of the upstairs bedrooms.
On Tuesday the plaster/gyprock team started. What a hard working bunch of guys. They were there at first light and worked like maniacs until it was dark. They got it all done in three days - which I thought was very impressive - considering it is a 51 square house. Then on Friday last week the stairs were installed - and we are very happy with how they have turned out.
I spoke with our SS on Friday arvo - and he reports the chippies are coming in on Tuesday to installt he doors so we can get to lock up. The Kitchen is then scheduled to go in on Wednesday!
Some pictures below....enjoy!
The house from the front with scaffolding down and roof completed:
The view from the front door:
Our lovely new staircase. It is not quite finished here. The under stairs door and plaster still need to be done:
The front entrance niches:
Entrance to home theatre:
Looking down the hall from the upstairs front balcony:
Living room and rumpus:
Kitchen & dining:
There was a few weeks delays finishing the lower roof due to all the rain Sydney had in the beginning of June. But the guys bolted down and got the roof completed a couple of weeks ago. We also finally had our electricity connected...which Wisdom were patiently waiting for me to organise. We wanted three phase power - but unlucky for us we have underground power - and our power was connected about 50m around the corner. I had to get a level 2 electrician to dig a trench and run extra cables. This alone cost a small fortune - but we are just happy it is now done.
Last week we had the insulation team come through. They were a lovely elderly couple (certainly not your typical tradesmen!). They installed all the bradford R2.0 wall and R3.5 ceiling batts. I also went through afterwards and installed some sound proofing batts in the ceiling between the home theatre and one of the upstairs bedrooms.
On Tuesday the plaster/gyprock team started. What a hard working bunch of guys. They were there at first light and worked like maniacs until it was dark. They got it all done in three days - which I thought was very impressive - considering it is a 51 square house. Then on Friday last week the stairs were installed - and we are very happy with how they have turned out.
I spoke with our SS on Friday arvo - and he reports the chippies are coming in on Tuesday to installt he doors so we can get to lock up. The Kitchen is then scheduled to go in on Wednesday!
Some pictures below....enjoy!
The house from the front with scaffolding down and roof completed:
The view from the front door:
Our lovely new staircase. It is not quite finished here. The under stairs door and plaster still need to be done:
The front entrance niches:
Entrance to home theatre:
Looking down the hall from the upstairs front balcony:
Living room and rumpus:
Kitchen & dining: